ANLEXX solutions

The production task defines the solution

We first study the product, line and required outcome. Then we define the technology, equipment, integration and verification criteria.

Discuss the production task
02 / Guide

Where to begin the selection

01

What happens now?

Describe the current process, instability, manual operation or requirement for a new production area.

02

What needs to change?

Define the expected result: apply a code, attach a label, package or inspect the product.

03

What are the constraints?

Line speed, material, dimensions, environment, available space and data exchange affect the configuration.

03 / Route

How an engineering solution is formed

01Input data
02Engineering assessment
03Technology and configuration
04Integration
05Acceptance and service
04 / Start

Send the task to an engineer — a completed specification is not required

A product description, a photo of the area and the expected result are enough for the first discussion.